Brickwork hanging over the edge of the slab
Why more than 15mm of brick overhang is a major defect at handover.
A room by room list of what still needs fixing, delivered while the builder is still waiting on your final payment.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
A handover inspection is measured against your building contract, plans and selections, the National Construction Code and ABCB Housing Provisions, the NSW Guide to Standards and Tolerances 2017, and the Australian Standards that apply to each element.
34 checkpoints across 9 areas on a standard Cobbitty pre-handover (PCI) inspection. Anything locked, stacked with materials or unsafe to reach on the day is named in the report as not inspected, with the reason, so you know what is still open.
Recorded at practical completion on Cobbitty homes.











Why more than 15mm of brick overhang is a major defect at handover.

Undersized balcony waste pipes, and why they matter on two storey homes over living space.

How new concrete cracks when nobody tells it where to crack.
New Construction Stage Inspections Seven independent checks on a Cobbitty build, each booked before the work is covered.
Defect Investigation Reports One recurring problem examined until the cause is clear.
Pre-Purchase Building Inspections A visual AS 4349.1 inspection for estate homes and older acreage houses alike.
Building and Pest Inspections Building and timber pest reports from a single visit. Instant online pricing, or talk to the booking team on 1300 471 805.
Two to three weeks if the builder will allow it. That leaves room to fix the list and for us to come back before the final payment.
It is recorded as a major defect when the overhang exceeds 15mm, because the brickwork is not fully supported by the slab edge. The builder or engineer needs to confirm the fix.
Concrete shrinks and moves. Without control cuts and an isolation joint at the house slab, it cracks where it chooses rather than where it should.
That depends on your contract. The report gives you a clear written list to negotiate with, and practical completion usually means the home is reasonably fit for occupation with only minor omissions.
Electrical circuits, gas, hot water and appliances are not tested, plumbing is not pressure tested, and nothing is opened up. We do not issue the occupation certificate. Those belong to licensed trades and the principal certifier.